LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2012 >> C/V >> Repair and Diagnosis >> External Pages >> Different car >> Section 19 (Electronic Control Modules (Service Information)) >> Module, Power Liftgate Control >> Diagnosis And Testing >> Power Liftgate Control Module
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Liftgate Control Module

WARNING: This page is about a different car, the 2011 Dodge Grand Caravan and 2011 Chrysler Town & Country. However, it is still accessible from the selected car via links, so may be relevant.

Any diagnosis of the Power Liftgate System should begin with the use of a diagnostic scan tool. For information on the use of the scan tool, refer to the appropriate Diagnostic Procedures Information. 

Inspect the related wiring harness connectors for broken, bent, pushed out, or corroded terminals. Refer to the appropriate wiring information for complete circuit schematic or connector pin-out information. 

Before any testing of the power liftgate system is attempted, the battery should be fully-charged.