Primary Circuit Continuity Check
- Insert a small straight pin in control module Green wire. Connect negative voltmeter lead to distributor base, and positive lead to pin in Green wire.
- With ignition switch in "RUN" position, measure voltage. Turn ignition switch "OFF" and remove straight pin from Green wire.
- If voltage reading was greater than 1.5 volts, proceed to "GROUND CIRCUIT CONTINUITY CHECK ". If voltage reading was 1.5 volts or less, replace control module.
Reluctor shown, having 8 teeth, is for V8 engine.