2.5L TBI Fuel Assembly R & I, & Overhaul: Reassembly
- Attach ISC motor, if removed, to bracket with 3 retaining screws and tighten to 40-49 INCH lbs. (4.5-5.5 N.m). Install ISC motor and bracket assembly and tighten to 31-44 INCH lbs. (3.5-5.0 N.m).
- Position TPS with connector facing upward toward main body. rotate counterclockwise ONLY and align screw holes. Tighten screws to 25-28 INCH lbs. (2.8-3.1 N.m).CAUTION: Failure to install TPS in this manner may result in excessive idle speeds.
- Position main body to throttle body gasket. Install throttle body to main body with 4 retaining screws. Tighten to 27-40 INCH lbs. (3.0-4.5 N.m).
- Install fuel injector and fuel pressure regulator. Attach throttle body with new gasket to body. Clean and install screen in fuel inlet channel.
- Clean loose material from fuel fittings and coat with Loctite (290). Install fuel fittings and tighten to 11-14 ft. lbs. (15-19 N.m).