Removal & Installation: Notes
NOTE:
Anytime actuator drive assembly, Left Power Sliding Door Module (LPSDM), Right Power Sliding Door Module (RPSDM), Rear Electronic Module (REM) or Fuse Junction Box (FJB) fuse No. 6 (15-amp) is replaced or removed, power sliding doors must be initialized. See PROGRAMMING .
NOTE:
Central Junction Box (CJB) may also be referred to as Fuse Junction Box (FJB).