Intake Manifold Assembly - 5.4L: Assembly
WARNING: This page is about a different car, the 2008 Ford RV Cutaway, 2008 Ford Econoline, 2008 Ford E450 Super Duty, and 2008 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
- Position new gaskets, the coolant crossover tube and install the 6 bolts.
- Tighten to 10 Nm (89 lb-in).
- Install the engine noise shield.
- Install the 8 fuel injectors into the fuel rail.
- Position the rail and install the 4 bolts.
- Tighten to 10 Nm (89 lb-in).
- Using a new O-ring seal, position the fuel rail pressure and temperature sensor and install the 2 bolts.
- Tighten to 7 Nm (62 lb-in).
NOTE:
When installing the fuel injectors, make sure that the injectors are fully engaged in the fuel injector cups.
NOTE:
Lubricate the new O-ring seals with clean engine oil prior to installation.