LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2004 >> Excursion 5.4 L, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1848 (Engine - 4.6L And 5.4L) >> Disassembly And Assembly Of Subassemblies >> Intake Manifold Assembly - 5.4L >> Assembly
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Manifold Assembly - 5.4L: Assembly

WARNING: This page is about a different car, the 2008 Ford RV Cutaway, 2008 Ford Econoline, 2008 Ford E450 Super Duty, and 2008 Ford Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
  1. Position new gaskets, the coolant crossover tube and install the 6 bolts.
    • Tighten to 10 Nm (89 lb-in).
  2. Install the engine noise shield.
  3. Fig 1: Engine Noise Shield
    GF0011710Courtesy of FORD MOTOR CO.
    NOTE: When installing the fuel injectors, make sure that the injectors are fully engaged in the fuel injector cups.
    NOTE: Lubricate the new O-ring seals with clean engine oil prior to installation.
  4. Install the 8 fuel injectors into the fuel rail.
  5. Position the rail and install the 4 bolts.
    • Tighten to 10 Nm (89 lb-in).
  6. Using a new O-ring seal, position the fuel rail pressure and temperature sensor and install the 2 bolts.
    • Tighten to 7 Nm (62 lb-in).