LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2007 >> Econoline E250, Van Cargo Extended, 5.4 L >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 16 (Automatic Transmission - 5R110W - General Procedures, In-Vehicle Servicing, Removal, Disassembly, Disassembly And Assembly Of Subassemblies, Assembly, Installation) >> In-Vehicle Servicing >> Line Pressure Control Solenoid - Pc-A >> Removal
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Line Pressure Control Solenoid - Pc-A: Removal

WARNING: This page is about a different variant/trim than selected.
  1. With the vehicle in NEUTRAL, position it on a hoist. For additional information, refer to JACKING AND LIFTING article.
  2. Remove the transmission main control valve body. For additional information, refer to Solenoid Body Assembly .
  3. Fig 1: Locating Solenoid Body Electrical Connector O-Ring Seal
    G03889078Courtesy of FORD MOTOR CO.
  4. Remove the solenoid body electrical connector O-ring seal.
  5. Fig 2: Identifying Solenoid Body Electrical Wire Harness
    GF0006832Courtesy of FORD MOTOR CO.
  6. Partially remove the solenoid body electrical wire harness.
    • Remove the wire harness-to-solenoid body bolts.
    • Disconnect the electrical connector from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C)
    • Lift the tab on the bulkhead connector, twist and push the bulkhead connector through the solenoid body.
  7. Fig 3: Identifying Pressure Control Solenoid
    GF0006833Courtesy of FORD MOTOR CO.
  8. Remove the pressure control solenoid (PC-A).
    • Remove the (E) retaining clips from the pressure control solenoid (PC-A) and the shift solenoid (SSPC-C).
    • Partially slide the shift solenoid (SSPC-C) back enough to gain clearance to remove the pressure control solenoid (PC-A).
    • Remove the pressure control solenoid (PC-A).