LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2012 >> Mustang Base, 2D Convertible, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 12 (OEM Component Testing - F150) >> Component Testing >> Overhead console switch assembly - Roof opening panel control switch >> Component testing procedure - Roof opening panel control switch
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Component testing procedure - Roof opening panel control switch

WARNING: This page is about a different car, the 2012 Ford Pickup. However, it is still accessible from the selected car via links, so may be relevant.
COMPONENT TESTING PROCEDURE CHART - ROOF OPENING PANEL CONTROL SWITCH

Circuit to test Connect self-powered test light or ohmmeter to terminals Move switch to these positions A good switch will indicate
Tilt circuit 12 and 3 Pull Tilt (UP) Closed circuit
12 and 8
12 and 3 Press Tilt (DOWN) Closed circuit
12 and 6
Slide circuit 12 and 8 Pull Slide (UP) Closed circuit
12 and 6 Press Slide (DOWN) Closed circuit