LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2013 >> Escape S >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Engine Cooling System >> Removal And Installation >> Cooling Module - 2.5L >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Cooling Module - 2.5L: Installation

  1. To install, reverse the removal procedure.
  2. Fill and bleed the cooling system. Refer to COOLING SYSTEM DRAINING, FILLING AND BLEEDING .
  3. Evacuate, leak test and charge the A/C system:

    For EATC system, refer to CLIMATE CONTROL SYSTEM - ELECTRONIC MANUAL TEMPERATURE CONTROL (EMTC) .

    For DATC system, refer to CLIMATE CONTROL SYSTEM - DUAL AUTOMATIC TEMPERATURE CONTROL (DATC) .