Pinpoint Test B : Paddle Shift Does Not Operate Correctly
- Refer to Wiring Diagrams for schematic and connector information.
Normal Operation and Fault Conditions
Each paddle shift switch is a momentary contact switch integral to the steering wheel. When the selector lever is placed in the sport shift position, the upshift/downshift feature becomes activated and allows the operator to upshift or downshift without removing their hands from the steering wheel.
Possible Sources
- Circuit open or shorted
- Paddle shift switches
- Clockspring
- SCCM
- PCM
- B1 VERIFY GEAR POSITION
- Using a diagnostic scan tool, access the PCM and monitor PID TR.
- Move the selector lever to all gear positions while monitoring PID TR.
Does PID TR agree with all selector lever positions?
Yes GO to B2 No RESOLVE any diagnostic trouble codes (DTCs) related to the TR sensor. REFER to: DTC Chart and Pinpoint Tests - 2.3L EcoBoost (231kW/314PS) . REFER to: DTC Chart and Pinpoint Tests - 5.0L Ti-VCT V8 (308kW/418PS) . If no TR sensor diagnostic trouble codes (DTCs) are present, RESOLVE the Selector lever linkage is out of correct gear relationship concern. REFER to Symptom Chart - B2 CHECK THE UPSHIFT CIRCUIT FOR VOLTAGE
- Ignition OFF.
- Disconnect Upshift paddle switch C2428.
- Inspect for damaged or pushed-out terminals.
- Ignition ON.
- Measure:
Positive Lead Measurement / Action Negative Lead C2428-1 Ground
Is the voltage greater than 11 volts?
Yes GO to B5 No GO to B3 - B3 CHECK THE UPSHIFT SIGNAL CIRCUIT FOR AN OPEN
- Ignition OFF.
- Disconnect PCM C1551B (for vehicles equipped with the 2.3L Ecoboost engine).
- Disconnect PCM C175B (for vehicles equipped with the 5.0L Ti-VCT V8 engine).
- Inspect the connectors for damaged or pushed-out terminals.
- For vehicles equipped with the 2.3L, measure:
Positive Lead Measurement / Action Negative Lead C2428-1 C1551B-6
- For vehicles equipped with the 5.0L, measure:
Positive Lead Measurement / Action Negative Lead C2428-1 C175B-53
Is the resistance less than 3 ohms?
Yes GO to B4 No REFER to the Wiring Diagrams manual to identify and repair the open circuit. - B4 CHECK THE UPSHIFT SIGNAL CIRCUIT FOR A SHORT TO GROUND
- Measure:
Positive Lead Measurement / Action Negative Lead C2428-1 Ground
Is the resistance greater than 10, 000 ohms?
Yes Refer to PCM Guided Routine .After programming the new PCM, CARRY OUT the transmission strategy download. REFER to: Transmission Strategy Download . No REFER to the Wiring Diagrams manual to identify and repair the short to ground. - Measure:
- B5 CHECK THE DOWNSHIFT CIRCUIT FOR VOLTAGE
- Ignition OFF.
- Disconnect Downshift paddle switch C2429.
- Inspect the connectors for damaged or pushed-out terminals.
- Ignition ON.
- Measure:
Positive Lead Measurement / Action Negative Lead C2429-4 Ground
Is the voltage greater than 11 volts?
Yes GO to B8 No GO to B6 - B6 CHECK THE DOWNSHIFT SIGNAL CIRCUIT FOR AN OPEN
- Ignition OFF.
- Disconnect PCM C1551B (for vehicles equipped with the 2.3L Ecoboost engine).
- Disconnect PCM C175B (for vehicles equipped with the 5.0L Ti-VCT V8 engine).
- Inspect the connectors for damaged or pushed-out terminals.
Is the resistance less than 3 ohms?
Yes GO to B7 No REFER to the Wiring Diagrams manual to identify and repair the open circuit. - B7 CHECK THE DOWNSHIFT SIGNAL CIRCUIT FOR A SHORT TO GROUND
- Measure:
Positive Lead Measurement / Action Negative Lead C2429-4 Ground
Is the resistance greater than 10, 000 ohms?
Yes Refer to PCM Guided Routine .After programming the new PCM, CARRY OUT the transmission strategy download. REFER to: Transmission Strategy Download . No REFER to the Wiring Diagrams manual to identify and repair the short to ground. - Measure:
- B8 CHECK THE SIGNAL RETURN CIRCUIT FOR AN OPEN
- Ignition OFF.
- Disconnect PCM C1551B (for vehicles equipped with the 2.3L Ecoboost engine).
- Disconnect PCM C175B (for vehicles equipped with the 5.0L Ti-VCT V8 engine).
- Inspect the connectors for damaged or pushed-out terminals.
- For the 2.3L engine, measure:
Positive Lead Measurement / Action Negative Lead C2428-2 C1551B-4 Positive Lead Measurement / Action Negative Lead C2429-3 C1551B-4
- For the 5.0L engine, measure:
Positive Lead Measurement / Action Negative Lead C2428-2 C175B-73 Positive Lead Measurement / Action Negative Lead C2429-3 C175B-73
Are the resistances less than 3 ohms?
Yes GO to B9 No REFER to the Wiring Diagrams manual to identify and repair the open circuit. - B9 TEST THE SELECTSHIFT™ SWITCHES
- For the upshift paddle switch, measure the following while pressing and releasing the upshift switch:
Positive Lead Measurement / Action Negative Lead upshift paddle switch, component side pin 1 upshift paddle switch, component side pin 2
- For the downshift paddle switch, measure the following while pressing and releasing the downshift switch:
Positive Lead Measurement / Action Negative Lead downshift paddle switch, component side pin 3 downshift paddle switch, component side pin 4
Are the resistances less than 3 ohms with the switch pressed, and greater than 10, 000 ohms with the switch released?
Yes Refer to PCM Guided Routine .After programming the new PCM, CARRY OUT the transmission strategy download. REFER to: Transmission Strategy Download . No For the upshift paddle switch, INSTALL a new upshift paddle switch. REFER to: Upshift Paddle Switch . For the downshift paddle switch, INSTALL a new downshift paddle switch. REFER to: Downshift Paddle Switch . - For the upshift paddle switch, measure the following while pressing and releasing the upshift switch: