LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 2019 >> Terrain Denali, FWD >> Repair and Diagnosis >> Engine Mechanical >> Starter >> Battery, Charging System And Starting System >> Repair Instructions >> Battery Monitor Module Replacement (KL9) >> Installation Procedure
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Installation Procedure

  1. Battery Monitor Module (2) - Install
    GM4582272Courtesy of GENERAL MOTORS COMPANY
  2. Battery Negative Post Clamp Nut (1) - Tighten 4.5 N.m (40 lb in)
    CAUTION:

    Refer to Fastener Caution .

  3. Electrical Connector (2) - Connect
    GM4582267Courtesy of GENERAL MOTORS COMPANY
  4. Battery Negative Cable (3) - Install
  5. Battery Negative Cable Nut (1) - Tighten 9 N.m (80 lb in)
  6. Perform the battery sensor learn procedure. Battery Sensor Module Learn .