LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Geo >> 1992 >> Tracker 4x2 L4-1590cc 1.6L >> Repair and Diagnosis >> Powertrain Management >> Ignition System >> Ignition Coil >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ignition Coil: Testing and Inspection

Measuring Ignition Coil Resistance:






NOTE: This test should be conducted with the coil disconnected completely. Make sure to make note of wire locations for reassembly.

1. Measure the primary ignition coil resistance between the positive (+) and the negative (-) coil terminals using a digital volt ohm meter. Primary coil resistance (cold) should be 0.72 to 0.88 ohms. If the resistance is NOT within specification, the coil must be replaced.

2. Measure the secondary coil resistance between the positive (+) and the coil wire terminal. Secondary resistance should be 10.2 to 14K ohms. If the resistance is NOT within specification, the coil must be replaced.