October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Latch Switch Test
4. Check for continuity between terminal No. 1 and terminal No. 2.
With the hatch open, there should be continuity.
With the hatch closed, there should be no continuity.