July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!
Power Window Relay: Testing and Inspection
1.Check for continuity between the terminals "3" and "5" with an ohmmeter. 2.Apply DC 12 V to the terminal "5" and ground the terminal "3". 3.Check for continuity between the terminals "1" and "2".