Test 7
1. Connect the GDS (scanner) to the data link connector.
2. Perform the fully open and the fully closing operation of the EEGR valve by using the actuation test.
3. Check that the voltage is within the specification.
SPECIFICATION
| Item | Specification |
|---|---|
| Opened Voltage (V) | 0.75 - 1.25 |
| Closed Voltage (V) | 3.85 - 4.15 |