Control Circuit Inspection
- IG "OFF"
- Disconnect fuel pump relay.
- IG "ON" & ENG "OFF"
- Measure voltage between harness terminal 3 and chassis ground.
Specification : Approx. 2.5V ~ 3V
- Is the measured voltage within specification ?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.