Power Circuit Inspection
- IG "OFF" and disconnect APS connector.
- IG "ON" & ENG "OFF"
- Measure voltage between harness terminal 6 of APS and chassis ground.
Specification : Approx. 5V
- Is the measured voltage within specification ?
YES
- Go to "SIGNAL CIRCUIT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.