Signal Circuit Inspection
- Check short to ground in harness
- IG "OFF".
- Disconnect APS and PCM connector.
- Measure resistance between terminal 1 of APS harness connector and chassis ground.
- Measure resistance between terminal 1 and 5 of APS harness connector.
- Measure resistance between terminal 1 and 4 of APS harness connector.
Specification : Infinite
- Is the measured resistance within specification ?
YES
- Go to " 1Check open in harness" as follows.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.
- Check open in harness
- IG "OFF".
- Disconnect APS and PCM connector.
- Measure resistance between terminal 1 of APS harness connector and terminal 49 of PCM harness connector.
Specification : Approx. below 1 Ω
- Is the measured resistance within specification ?
YES
- Go to "COMPONENT INSPECTION " procedure.
NO
- Repair or replace as necessary and then, go to "VERIFICATION OF VEHICLE REPAIR " procedure.