LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2009 >> Entourage GLS >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Communication Devices >> BCM (Body Control Module) >> BCM (Body Control Module) >> DTC B1913 Right OSM Vertical Motor Or Sensor Error >> Power Supply Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Supply Circuit Inspection

  1. Motor Power circuit Inspection
    1. Ignition "OFF"
    2. Disconnect right outside mirror.
    3. Measure resistance between terminal "10" of ADM and chassis ground.
    4. Measure resistance between terminal "11" of ADM and chassis ground.

      Specification : Approx. ∞ Ω

      Fig 1: Measuring Resistance Between Terminal "11" Of ADM And Chassis Ground
      G05324968Courtesy of HYUNDAI MOTOR CO.
    5. Is the measured resistance within specifications?

      YES 

      Go to " 2 Sensor Power circuit Inspection" procedure.

      NO 

      Check for short in signal harness. Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.

  2. Sensor Power circuit Inspection
    1. Ignition "ON" & Engine "OFF"
    2. Disconnect right outside mirror.
    3. Measure voltage between terminal "16" of ADM and chassis ground.

      Specification : Approx. 5V

      Fig 2: Measuring Voltage Between Terminal "16" Of ADM And Chassis Ground
      G05324963Courtesy of HYUNDAI MOTOR CO.
    4. Is the measured voltage within specifications?

      YES 

      Go to "COMPONENT INSPECTION " procedure.

      NO 

      Check for open or short in harness. Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.