LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2010 >> Azera GLS >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (1 Of 3) >> DTC P0140: O2 Sensor Circuit No Activity Detected (Bank 1/Sensor 2) >> Inspection/Repair >> W/Harness Inspection >> Ground Circuit inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ground Circuit inspection

  1. IG "ON" and disconnect HO2S (B1/S2) connector.
  2. Measure voltage between terminal 3 of HO2S (B1/S2) harness connector and chassis ground.
  3. Measure voltage between terminals 3 and 4 of HO2S (B1/S2) harness connector.

    Specification  : Voltage difference between measurement "A" and "B" is below 200mV.

    Fig 1: Measuring Voltage Between Terminal 3 Of HO2S (B1/S2) Harness Connector And Chassis Ground
    G06800088Courtesy of HYUNDAI MOTOR CO.
    Fig 2: Measuring Voltage Between Terminals 3 And 4 Of HO2S (B1/S2) Harness Connector
    G06800089Courtesy of HYUNDAI MOTOR CO.
  4. Is the measured voltage within specification?

    YES 

    NO