Repair Procedures: Installation: Notes
- Turn the engine OFF.
- Disconnect the battery negative cable and wait for at least three minutes before beginning work.
- Install the SRSCM with the SRSCM mounting bolts.
Tightening torque:
7.5 ~ 10.5 N.m (0.76 ~ 1.07 kgf.m, 5.5 ~ 7.7 lb-ft)
- Connect the SRSCM harness connector.
- Install the floor console assembly.
(Refer to "FLOOR CONSOLE ASSEMBLY ")
- Reconnect the battery negative cable.
- After installing the SRSCM, confirm proper system operation:
Turn the ignition switch ON; the SRS indicator light should be turned on for about six seconds and then go off.
CAUTION: If the SRSCM is replaced always, perform variant coding. Also, perform the lateral G sensor 0 point setup. (Refer to "YAW-RATE AND LATERAL G SENSOR ")