Signal Circuit Inspection
■ Check short to ground in harness
- IG "OFF".
- Disconnect APS connector and PCM connector.
- Measure resistance between APS 1 signal terminal of APS harness connector and chassis ground. (Measurement "A")
- Measure resistance between APS 1 signal and APS 1 (2) ground terminals of APS harness connector. (Measurement "B")
Specification: Infinite
- Is the measured resistance within specification?
YES
- Go to "Check open in harness" as follows.
NO
- Repair short to ground in harness. Go to "VERIFICATION OF VEHICLE REPAIR " procedure.
■ Check open in harness
- IG "OFF". Disconnect APS connector and PCM connector.
- Measure resistance between APS 1 signal terminal of APS harness connector and APS 1 signal terminal of PCM harness connector.
Specification: Approx. below 1Ω.
- Is the measured resistance within specification?
YES
- Go to "Component Inspection" procedure below.
NO
- Repair open in harness. Go to "VERIFICATION OF VEHICLE REPAIR " procedure.