Control Circuit Inspection
- IG "OFF" & Disconnect HO2S(S1) connector.
- IG "ON".
- Measure voltage between control terminal of HO2S(S1) heater harness connector and chassis ground.
Specification: Approx. 3.5V
2
- Is the measured voltage within specification?
YES
- Go to Component Inspection procedure below.
NO
- Repair or replace as necessary and then, go to "Verification of Vehicle Repair " procedure.