LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2017 >> Azera Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (2 Of 3) >> DTC P0223: Throttle Position Sensor 2 Signal Circuit High Input >> W/Harness Inspection >> Ground Circuit Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Ground Circuit Inspection

Check open in harness 

  1. IG "OFF" and disconnect ECTS connector and then IG "ON".
  2. Measure voltage between TPS power terminal of ETC Motor & TPS harness connector and chassis ground.(Measurement "A")
  3. Measure voltage between TPS power and TPS ground terminals of ETC Motor & TPS harness connector.(Measurement "B")

    Specification:  Voltage difference between measurement "A" and "B" is below 200mV.

    Fig 1: Measuring Voltage Between TPS Power Terminal Of ETC Motor & TPS Harness Connector And Chassis Ground (Measurement A)
    G12087888Courtesy of HYUNDAI MOTOR AMERICA
    Fig 2: Measuring Voltage Between TPS Power And TPS Ground Terminals Of ETC Motor & TPS Harness Connector (Measurement B)
    G12087889Courtesy of HYUNDAI MOTOR AMERICA
  4. Is the measured voltage within specification?

    YES 

    NO