Check open in harness
- IG "OFF". Disconnect ETC Motor & TPS connector and PCM connector.
- Measure resistance between TPS2 signal terminal of ETC Motor & TPS harness connector and TPS2 signal terminal of PCM harness connector.
Specification: Below 1Ω
- Is the measured resistance within specification?
YES
- Go to "GROUND CIRCUIT INSPECTION " procedure.
NO
- Repair open in harness. Go to "VERIFICATION OF VEHICLE REPAIR " procedure.