October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Repair Procedures: Inspection
Connect the GDS on the Diagnosis Link Connector (DLC).
Start engine and check output voltages of APS 1 and 2 at C.T and W.O.T.