LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 1996 >> G20 Base, Standard, RS5F32V >> Repair and Diagnosis >> Engine Performance >> System >> Engine Controls - System/Component Tests 2.0L >> Idle Control System >> System Test
April 5, 2026: LEMON Manuals is launched! Read the announcement.

System Test

  1. Start engine, and warm to operating temperature. Check idle speed. If idle speed is excessive, disconnect IAC valve harness connector. Idle speed should drop.
  2. If idle speed does not drop, check for battery voltage at IAC valve connector terminal "A" (Orange wire). If battery voltage is present, go to next step. If battery voltage is not present, check fuses and harness for open circuit.
  3. Turn ignition off. Disconnect ECM harness connector. Check harness continuity between IAC valve connector terminal "B" (Blue wire) and ECM terminal No. 101.
  4. Continuity should exist. If continuity does not exist, repair wiring as necessary. If harness tests okay, test IAC valve and inspect ECM connector terminal pins for corrosion or damage.
IDLE SPEED SYSTEM INPUT SIGNALS

Application Model Usage
A/C Clutch Signal G20
Battery Voltage G20
Crankshaft Position Sensor G20
Engine Coolant Temperature G20
Ignition (START) Signal G20
Neutral Switch (1) G20
Park/Neutral Switch G20
Power Steering Pressure Switch G20
Throttle Position Sensor G20
Vehicle Speed Sensor G20
(1) M/T models only.