LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2002 >> Q45 >> Repair and Diagnosis >> External Pages >> Different car >> Section 216 (Engine Control System) >> On Board Diagnostic (OBD) System >> Emission-Related Diagnostic Information >> System Readiness Test (SRT) Code >> SRT Set Timing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

SRT Set Timing

WARNING: This page is about a different car, the 2004 Infiniti Q45. However, it is still accessible from the selected car via links, so may be relevant.

SRT is set as "CMPLT" after self-diagnosis has been performed one or more times. Completion of SRT is done regardless of whether the result is OK or NG. The set timing is different between OK and NG results and is shown in the table below.

Fig 1: SRT Set Timing Table
G00745005Courtesy of NISSAN MOTOR CO., U.S.A.

When all SRT related self-diagnoses showed OK results in a single cycle (Ignition OFF-ON-OFF), the SRT will indicate "CMPLT". See Case 1 in Fig 1.

When all SRT related self-diagnoses showed OK results through several different cycles, the SRT will indicate "CMPLT' at the time the respective self-diagnoses have at least one OK result. See Case 2 in Fig 1

If one or more SRT related self-diagnoses showed NG results in 2 consecutive cycles, the SRT will also indicate "CMPLT". See Case 3 in Fig 1

The table above shows that the minimum number of cycles for setting SRT as "INCMP" is one (1) for each self-diagnosis (Case 1 & 2) or two (2) for one of self-diagnoses (Case 3). However, in preparation for the state emissions inspection, it is unnecessary for each self-diagnosis to be executed twice (Case 3) for the following reasons: