Shift Rod Assembly
- Install fork guide, shift fork spring, 2-4 fork, and L-H fork to shift rod, and secure them with new retaining pins.NOTE: Do not reuse retaining pins.
- Install 2-4 sleeve and L-H sleeve to each fork.
- While aligning L-H sleeve with planetary carrier, install shift rod assembly to front case.
- Remove all the liquid gasket on check plug and front case, and install check ball and check spring to front case. Apply specified sealant or equivalent, to check plug. Install it to front case, and tighten to specified torque. Refer to
RECOMMENDED CHEMICAL PRODUCTS AND SEALANTS
.
Front case check plug : 22 N.m (2.2 kg-m, 16 ft-lb)
- Remove all the liquid gasket on the switch fitting and inner side of front case, and with wait detection switch threaded one pitch into the hole. Apply specified sealant or equivalent, to the thread. Install it, and tighten to specified torque. Refer to
RECOMMENDED CHEMICAL PRODUCTS AND SEALANTS
.
Wait detection switch :28 N.m (2.9 kg-m, 21 ft-lb)
NOTE: Wait detection switch harness connector is black. - Install center case assembly to front case assembly. Refer to FINAL ASSEMBLY .
- Install rear case assembly to center case. Refer to FINAL ASSEMBLY .