LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2006 >> M35 Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 15 (Front Final Drive) >> Front Final Drive Assembly >> Disassembly and Assembly >> Assembly Inspection And Adjustment >> Total Preload Torque
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Total Preload Torque

WARNING: This page is about a different car, the 2006 Infiniti QX56. However, it is still accessible from the selected car via links, so may be relevant.
  1. Rotate drive pinion back and forth 2 to 3 times to check for unusual noise and rotation malfunction.
  2. Rotate drive pinion at least 20 times to check for smooth operation of the bearing.
  3. Measure total preload with preload gauge.

    Tool number : ST3127S000 (J-25765-A) 

    Total preload (with oil seal): 

    2.98 - 4.76 N.m (0.31 - 0.48 kg-m, 27 - 42 in-lb) 

    Fig 1: Measuring Total Preload With Preload Gauge
    G04134323Courtesy of NISSAN MOTOR CO., U.S.A.
    • If measured value is out of the specification, disassemble it to check and adjust each part. Adjust the pinion bearing preload and side bearing preload.

      Adjust the pinion bearing preload first, then adjust the side bearing preload.

      When the preload torque is large 

      On pinion bearings: Replace the collapsible spacer. 

      On side bearings: Loosen the side bearing adjust nuts at the same force on each side. 

      When the preload is small 

      On pinion bearings: Tighten the drive pinion nut. 

      On side bearings: Tighten the side bearing adjust nuts at the same force on each side.