LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2006 >> M45 >> Repair and Diagnosis >> Brakes >> Traction Control >> Brake Control System >> Trouble Diagnosis >> Active Test >> Operation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Operation Procedure

  1. Touch "START (NISSAN BASED VHCL)", "ABS", "ACTIVE TEST" in order on the CONSULT-II screen.
    CAUTION: When "START (NISSAN BASED VHCL)" is touched immediately after starting engine or turning on ignition switch, "ABS" might not be displayed in the "SELECT SYSTEM" screen. In this case, repeat the operation from step 1.
  2. Touch "SELECT TEST ITEM" is displayed.
  3. Touch necessary test item.
    Fig 1: Displaying Active Test Screen
    G04144781Courtesy of NISSAN MOTOR CO., U.S.A.
  4. While "MAIN SIGNALS" indication is inverted, touch "START".
  5. "ACTIVE TEST" screen will be displayed so perform the following test.
NOTE:
  • When active test is performed while depressing the pedal, the pedal depression amount will change. This is normal. (Only solenoid valve and ABS motor)
  • "TEST IS STOPPED" is displayed 10 seconds after operation start.
  • After "TEST IS STOPPED" is displayed, to perform test again, touch "BACK" and repeat step 3.