Diagnostic Procedure
- CHECK POWER SUPPLY CIRCUIT 1
With CONSULT-II
Check ("IGN ACC SW") in DATA MONITOR mode with CONSULT-II.
When ignition switch is turned to ACC
ACC ON SW : ON
Without CONSULT-II
Check voltage between Intelligent Key unit connector and ground.
TERMINAL VOLTAGE CHARTTerminals Ignition switch condition Voltage (V) (Approx.) (+) (-) Intelligent Key unit connector Terminal M32 30 Ground ACC Battery voltage OFF 0 OK or NG
OK: ACC power circuit is OK. Check the self-diagnosis results using CONSULT-II again.
NG: GO TO 2.
- CHECK COMMUNICATION CIRCUIT
- Turn ignition switch OFF.
- Disconnect Intelligent Key unit and power distribution unit connector.
- Check continuity between Intelligent Key unit connector and power distribution unit connector.TERMINAL CONTINUITY CHART
A B Continuity Intelligent Key unit connector Terminal Power distribution unit connector Terminal M33 42 M30 1 Yes - Check continuity between Intelligent Key unit connector and ground.TERMINAL CONTINUITY CHART
A Ground Continuity Intelligent Key unit connector Terminal M33 42 No
OK or NG
OK: GO TO 3.
NG: Repair or replace harness.
- CHECK POWER SUPPLY CIRCUIT 2
- Connect Intelligent Key unit and power distribution unit connector.
- Check voltage between Intelligent Key unit connector and ground.TERMINAL VOLTAGE CHART
Terminals Ignition switch condition Voltage (V) (Approx.) (+) (-) Intelligent Key unit connector Terminal M32 30 Ground ACC Battery voltage OFF 0
OK or NG
OK: Check the condition of harness and connector. If it is OK, check the self-diagnosis results using CONSULT-II again.
NG: Check the following.
- 10A fuse [No.6, located in the fuse block (J/B)]
- Harness for open or short between fuse and Intelligent Key unit.