LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2007 >> QX56 AWD >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Entertainment Systems >> Audio, Visual, Navigation & Telephone System >> Navigation System >> Display Communication Line Check (Between Display Control Unit and Display Unit)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Display Communication Line Check (Between Display Control Unit and Display Unit)

  1. CHECK HARNESS 
    1. Turn ignition switch OFF.
    2. Disconnect display unit connector M93 and display control unit connector M95.
    3. Check continuity between display control unit and display unit.
      CONNECTOR TERMINALS REFERENCE CHART

      Terminals Continuity
      Display control unit Display unit
      Connector Terminal Connector Terminal
      M95 36 M93 11 Yes
      38 22
    4. Check continuity between display control unit and ground.
      CONNECTOR TERMINALS REFERENCE CHART

      Terminals Continuity
      Display control unit -
      Connector Terminal
      M95 36 Ground No
      38
      Fig 1: Checking Continuity Between Display Control Unit And Display Unit
      G04904294

    OK or NG 

    OK: GO TO 2.

    NG: Repair harness or connector.

  2. CHECK 1: COMMUNICATION SIGNAL (DCU-DSP) 
    1. Connect display unit connector.
    2. Turn ignition switch ON.
    3. Check voltage between display unit harness connector M93 terminal 11 and ground.

      Approx. 3.5V or more. 

      Fig 2: Checking Voltage Between Display Unit Connector M93 Terminal 11 And Ground
      G04904295

    OK or NG 

    OK: GO TO 3.

    NG: Replace display unit. Refer to "DISPLAY UNIT "

  3. CHECK 2: COMMUNICATION SIGNAL (DSP-DCU) 
    1. Turn ignition switch OFF.
    2. Connect display control unit connector M95.
    3. Turn ignition switch ON.
    4. Check voltage between display control unit harness connector M95 terminal 38 and ground.

      Approx. 3.5V or more. 

      Fig 3: Checking Signal Between Display Control Unit Connector M95 Terminal 38 And Ground
      G04904296

    OK or NG 

    OK: GO TO 4.

    NG: Replace display control unit. Refer to "DISPLAY CONTROL UNIT ".

  4. CHECK 3: COMMUNICATION SIGNAL (DCU-DSP) 

    Check signal between display control unit harness connector M95 terminal 36 and ground with CONSULT-II or oscilloscope.

    36 - Ground :  Refer to "TERMINALS AND REFERENCE VALUE FOR DISPLAY CONTROL UNIT ".

    Fig 4: Checking Signal Between Display Control Unit Connector M95 Terminal 36 And Ground
    G04904297

    OK or NG 

    OK: GO TO 5.

    NG: Replace display control unit. Refer to "DISPLAY CONTROL UNIT ".

  5. CHECK 4: COMMUNICATION SIGNAL (DSP-DCU) 

    Check signal between display control unit harness connector M95 terminal 38 and ground with CONSULT-II or oscilloscope.

    38 - Ground :  Refer to "TERMINALS AND REFERENCE VALUE FOR DISPLAY CONTROL UNIT ".

    Fig 5: Checking Signal Between Display Control Unit Connector M95 Terminal 38 And Ground
    G04904296

    OK or NG 

    OK: Inspection End.

    NG: Replace display unit. Refer to "DISPLAY UNIT ".