LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2015 >> Q60 Base, 2D Convertible >> Repair and Diagnosis (Single Page) >> Electrical >> Charging Systems >> Charging System (Convertible) >> Basic Inspection >> Diagnosis And Repair Work Flow >> Work Flow (With Exp-800 NI Or Gr8-1200 NI) >> Detailed Flow
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Detailed Flow

NOTE:

To ensure a complete and thorough diagnosis, the battery, starter and alternator test segments must be done as a set from start to finish.

  1. PRELIMINARY INSPECTION

    Perform the preliminary inspection. Refer to INSPECTION PROCEDURE .

    GO TO STEP 2  .

  2. STOP POWER GENERATION VOLTAGE VARIABLE CONTROL SYSTEM

    Stop the operation of the power generation voltage variable control in either of the following procedures.

    • After selecting "ENGINE" of "SELECT SYSTEM" using CONSULT, set the DUTY value of "ALTERNATOR DUTY" to 0 % by selecting "ALTERNATOR DUTY" of "Active Test". Continue "Active Test" until the end of inspection. (When the DUTY value is 0 or 100 %, the normal power generation is performed according to the characteristic of the IC voltage regulator of the alternator.)
    • Turn the ignition switch OFF, and disconnect the battery current sensor connector. [However, DTC (P1550 - P1554) of the engine might remain. After finishing the inspection, connect the battery current sensor connector and erase the self-diagnosis results history of the engine using CONSULT.]

    GO TO STEP 3  .

  3. DIAGNOSIS WITH EXP-800 NI OR GR8-1200 NI

    Perform the charging system test using Multitasking battery and electrical diagnostic station GR8-1200 NI or Battery and electrical diagnostic analyzer EXP-800 NI. Refer to the applicable Instruction Manual for proper testing procedures.

    Test result

    NO PROBLEMS 

    Charging system is normal and will also show "DIODE RIPPLE" test result.

    NO VOLTAGE 

    GO TO STEP 4  .

    LOW VOLTAGE 

    GO TO STEP 12  .

    HIGH VOLTAGE 

    GO TO STEP 14  .

    EXCESSIVE RIPPLE, OPEN PHASE, OPEN DIODE or SHORTED DIODE 

    Replace the alternator. Perform "DIODE RIPPLE" test again using Multitasking battery and electrical diagnostic station GR8-1200 NI or Battery and electrical diagnostic analyzer EXP-800 NI to confirm repair.

  4. INSPECTION WITH CHARGE WARNING LAMP (IGNITION SWITCH IS ON)

    Turn the ignition switch ON.

    Does the charge warning lamp illuminate?

    YES 

    GO TO STEP 6  .

    NO 

    GO TO STEP 5  .

  5. "L" TERMINAL CIRCUIT (OPEN) INSPECTION

    Check "L" terminal circuit (open). Refer to DIAGNOSIS PROCEDURE .

    Is the "L" terminal circuit normal?

    YES 

    Replace alternator. Refer to REMOVAL AND INSTALLATION .

    NO 

    Repair as needed.

  6. INSPECTION WITH CHARGE WARNING LAMP (IDLING)

    Start the engine and run it at idle.

    Does the charge warning lamp turn OFF?

    YES 

    GO TO STEP 9  .

    NO 

    GO TO STEP 7  .

  7. "L" TERMINAL CIRCUIT (SHORT) INSPECTION

    Check "L" terminal circuit (short). Refer to DIAGNOSIS PROCEDURE .

    Is the "L" terminal circuit normal?

    YES 

    GO TO STEP 8  .

    NO 

    Repair as needed.

  8. "S" TERMINAL CIRCUIT INSPECTION

    Check "S" terminal circuit. Refer to DIAGNOSIS PROCEDURE .

    Is the "S" terminal circuit normal?

    YES 

    GO TO STEP 10  .

    NO 

    Repair as needed.

  9. INSPECTION WITH CHARGE WARNING LAMP (ENGINE AT 3, 000 RPM)

    Increase and maintain the engine speed at 3, 000 RPM.

    Does the charge warning lamp remain off?

    YES 

    GO TO STEP 11  .

    NO 

    GO TO STEP 10  .

  10. INSPECTION OF ALTERNATOR PULLEY

    Check alternator pulley. Refer to INSPECTION .

    Is alternator pulley normal?

    YES 

    Replace alternator. Refer to REMOVAL AND INSTALLATION .

    NO 

    Repair as needed.

  11. "B" TERMINAL CIRCUIT INSPECTION

    Check "B" terminal circuit. Refer to DIAGNOSIS PROCEDURE .

    Is "B" terminal circuit normal?

    YES 

    Replace alternator. Refer to REMOVAL AND INSTALLATION .

    NO 

    Repair as needed.

  12. "B" TERMINAL CIRCUIT INSPECTION

    Check "B" terminal circuit. Refer to DIAGNOSIS PROCEDURE .

    Is "B" terminal circuit normal?

    YES 

    GO TO STEP 13  .

    NO 

    Repair as needed.

  13. INSPECTION OF ALTERNATOR PULLEY

    Check alternator pulley. Refer to INSPECTION .

    Is alternator pulley normal?

    YES 

    Replace alternator. Refer to REMOVAL AND INSTALLATION .

    NO 

    Repair as needed.

  14. "S" TERMINAL CIRCUIT INSPECTION

    Check "S" terminal circuit. Refer to DIAGNOSIS PROCEDURE .

    Is the "S" terminal circuit normal?

    YES 

    Replace alternator. Refer to REMOVAL AND INSTALLATION .

    NO 

    Repair as needed.