LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2017 >> QX30 Base >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (Wiring Diagrams And Basic Inspection) >> Basic Inspection >> Additional Service When Replacing ECM >> Work Procedure (After Replacing ECM)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Work Procedure (After Replacing ECM)

  1. CHECK OPERATION LOG'

    G-20 With CONSULT

    Check Operation Log saved before replacing ECM, according to the procedure of "Programming" in CONSULT Operation Manual.

    NOTE:
    • Log in to the network, according to the CONSULT screen.
    • For the vehicle that the programming is to be performed, check if Operation Log of Vehicle Identification Number (VIN) is in Saved Data List.

    Is there an applicable Operation Log in the Saved Data List?

    YES 

    GO TO STEP 2  .

    NO 

    GO TO STEP 3  .

  2. PERFORM ECM PROGRAMMING

    G-20 With CONSULT

    Perform ECM programming, according to "Programming" of CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    CAUTION:

    During programming, maintain the following conditions:

    • Ignition switch: ON
    • Electric load: OFF
    • Brake pedal: Not depressed
    • Battery voltage: 12 - 13.5 V (Check the value displayed on the CONSULT screen.)
    NOTE:

    Log in to the network, according to the CONSULT screen.

    GO TO STEP 5  .

  3. READ IN ECM PART NUMBER BY FAST LINKED'

    Obtain ECM part number by NISSAN PARTS CATALOGUE GLOBAL Web-FAST, according to the procedure of FAST linked' in CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    NOTE:

    FAST linked' allows an appropriate programming by obtaining ECU part number from NISSAN PARTS CATALOGUE GLOBAL Web-FAST even when the part number cannot be obtained from the old ECU used before replacing with a new one.

    GO TO STEP 4  .

  4. PERFORM PROGRAMMING (FAST LINKED)

    G-20 With CONSULT

    Perform ECM programming according to the procedure of FAST linked in CONSULT Operation Manual. Refer to CONSULT Operation Manual.

    CAUTION:

    During programming, maintain the following conditions:

    • Ignition switch: ON
    • Electric load: OFF
    • Brake pedal: Not depressed
    • Battery voltage: 12 - 13.5 V (Check the value displayed on the CONSULT screen.)
    NOTE:

    Log in to the network, according to the CONSULT screen.

    GO TO STEP 5  .

  5. PERFORM CONFIGURATION (WRITING VEHICLE SPECIFICATION)

    G-20 With CONSULT

    Perform configuration. Refer to DESCRIPTION .

    NOTE:

    Log in to the network, according to the CONSULT screen.

    GO TO STEP 6  .

  6. PERFORM ACTIVATION OF FUEL PUMP

    G-20 With CONSULT

    Perform Activation of Fuel Pump. Refer to DESCRIPTION .

    GO TO STEP 7  .

  7. PERFORM ECU REGISTRATION

    G-20 With CONSULT

    NOTE:

    For details, refer to CONSULT Operation Manual.

    1. Select "Immobilizer".
    2. Touch "One of ECU to be replaced" and "ECM replacement (New)" to perform ECU registration.

    GO TO STEP 8  .

  8. PERFORM VIN REGISTRATION

    G-20 With CONSULT

    Perform VIN Registration. Refer to DESCRIPTION .

    GO TO STEP 9  .

  9. PERFORM INJECTOR INJECTION QUANTITY ADJUSTMENT VALUE REGISTRATION

    G-20 With CONSULT

    Perform INJECTOR INJECTION QUANTITY ADJUSTMENT. Refer to DESCRIPTION .

    GO TO STEP 10  .

  10. PERFORM TEACH IN OF THROTTLE VALVE STOP

    G-20 With CONSULT

    1. Select "ENGINE" >> "WORK SUPPORT" >> "TEACH IN OF THROTTLE VALVE STOP". Refer to DESCRIPTION .
    2. Follow the instruction of CONSULT display.

    GO TO STEP 11  .

  11. CHECK DTC

    1. Turn ignition switch OFF and wait at least 30 seconds.
    2. Turn ignition switch ON.
    3. Check DTC. If DTC is displayed, erase it.

    END