DTC Component Inspection (Quantity Control Valve)
- CHECK QUANTITY CONTROL VALVE-1
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check the resistance between ECM harness connector terminals.
ECM
Resistance (Ohm)
+
-
Terminal
75
76
0.3 - 1.1
Is the inspection result normal?
YES
INSPECTION END
NO
GO TO 2.
- CHECK QUANTITY CONTROL VALVE-2
- Disconnect quantity control valve harness connector.
- Check the resistance between quantity control valve terminals.
Quantity control valve
Resistance (Ohm)
+
-
Terminal
1
2
0.3 - 1.1
Is the inspection result normal?
YES
INSPECTION END
NO
Replace high pressure fuel pump. Refer to Removal and Installation .