LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Infiniti >> 2018 >> QX30 Essential, FWD >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transmission (Introduction And Basic Inspection) >> Basic Inspection >> Additional Service When Replacing Control Valve TCM >> Work Procedure (Before Replace Control Valve and TCM)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Work Procedure (Before Replace Control Valve and TCM)

  1. SAVE TCM DATA 

    SYMBOL With CONSULT

    1. Select "Work Support" in "TRANSMISSION".
    2. Perform "SAVING DATA FOR REPLC CPU".
    NOTE:
    • Necessary data in TCM is copied and saved to CONSULT.
    • Go to Step 2 regardless of with or without success in saving data.

    GO TO 2.

  2. SAVE ??OPERATION LOG' 

    SYMBOL With CONSULT

    Save Operation Log, according to the procedure of "Programming" in CONSULT Operation Manual.

    NOTE:
    • Log in to the network, according to the CONSULT screen.
    • TCM part number is saved in Operating Log saved in CONSULT.
    • After replacing control valve and TCM, perform necessary work.