LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Isuzu >> 1987 >> Impulse Base, Automatic, AW03-70 >> Repair and Diagnosis >> Engine Performance >> System >> Air Injection System >> Component Testing >> Vacuum Switching Valve >> All Others
April 5, 2026: LEMON Manuals is launched! Read the announcement.

All Others

Connect jumper wires from valve connector terminals directly to battery. Plunger should "click" with battery voltage applied. If plunger does not "click", replace valve.