LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Isuzu >> 1987 >> Impulse Base, Standard, MSG4K >> Repair and Diagnosis >> Engine Performance >> System >> Fuel Evaporation System >> Component Testing >> Canister Purge Control Valve >> Except Impulse
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Except Impulse

  1. Remove canister from vehicle. Apply 7.5 psi air pressure to port marked "VC". Air should not leak from diaphragm. See Fig 1 .
  2. Apply and maintain 15 in. Hg vacuum to port marked "PURGE". Gradually apply vacuum to "VC" port. Purge valve should begin to open when 7.1-8.7 in. Hg (1.6-3.2 in. Hg on I-Mark) vacuum is applied to port "VC". Replace valve if it does not operate as outlined.
Fig 1: Testing Purge Control Valve
G37913Courtesy of ISUZU MOTOR CO.