LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Isuzu >> 1997 >> Oasis LS >> Repair and Diagnosis >> Body & Frame >> Power Windows >> Component Testing >> Switch >> Master Switch Test
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Master Switch Test

Remove power window master switch. See MASTER POWER WINDOW SWITCH  under REMOVAL & INSTALLATION. Using an ohmmeter, check resistance of switch terminals with switch in indicated positions. If continuity is not as specified, replace switch. SeeFigure . See POWER WINDOW MASTER SWITCH TEST  .

POWER WINDOW MASTER SWITCH TEST (1)

Position Main Switch Pin Continuity
Left Front Switch N/A (2)
Right Front Switch
Off On A10, A12 & B2
Off Off A10 & A12
Up On A1 & A12; A10 & B2
Up Off A1 & A12
Down On A1 & A10; A12 & B2
Down Off A1 & A10
Right Rear Switch
Off On A9, A11 & B2
Off Off A9 & A11
Up On A2 & A11; A9 & B2
Up Off A2 & A11
Down On A2 & A9; A11 & B2
Down Off A2 & A9
Left Rear Switch
Off On A13, A15 & B2
Off Off A13 & A15
Up On A6 & A15; A13 & B2
Up Off A6 & A15
Down On A6 & A13; A15 & B2
Down Off A6 & A13
(1) For terminal identification, seeFigure .
(2) See SWITCH INPUT TEST. SeeFigure .