LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2003 >> Grand Cherokee Overland >> Repair and Diagnosis >> Body & Frame >> Exterior/Interior Trim >> Power Liftgate System >> Latch-Cables >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Liftgate System: Latch-Cables: Installation

  1. Install the cable and attach it to the latch.
  2. Connect the cable to the control assembly and secure the retainer clips.
  3. Attach the support clips if equipped.
  4. Install the latch. Refer to BODY/LIFTGATE/LATCH/GUIDE PLATE - INSTALLATION  .
  5. Adjust the cables. Refer to BODY/LIFTGATE/LATCH - CABLES - ADJUSTMENTS  .