LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2009 >> Commander Overland, 4WD >> Repair and Diagnosis >> Suspension >> Wheel Alignment >> Front Suspension >> Front >> Hub And Bearing >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Hub And Bearing: Installation: Installation

Fig 1: Wheel Speed Sensor
GC0100747Courtesy of CHRYSLER LLC
  1. Install the hub bearing (3) to the knuckle then tighten the 3 bolts to 115 N.m (85 ft. lbs.).
  2. Install the wheel speed sensor (1) into the hub (3) and then install the mounting bolt (2) and tighten to 12-14 N.m (106-124 in. lbs.). Refer to Brakes/Electrical/SENSOR, Wheel Speed - Installation .
    Fig 2: O-Ring
    GC0117755Courtesy of CHRYSLER LLC
    1 - ROTOR
    2 - O-RING
  3. Install the brake rotor (1). Refer to Brakes/Hydraulic/Mechanical/ROTOR, Brake - Installation .
    Fig 3: Caliper Adapter
    GC0117754Courtesy of CHRYSLER LLC
    1 - CALIPER ADAPTER
    2 - KNUCKLE
    3 - CALIPER ADAPTER BOLTS
    4 - ROTOR
  4. Install the brake caliper adaptor (1). Refer to Brakes/Hydraulic/Mechanical/ADAPTER, Disc Brake Caliper - Installation .
    Fig 4: Brake Calipers, Bolts & Adapters
    GC0117749Courtesy of CHRYSLER LLC
  5. Install the caliper (1). Refer to Brakes/Hydraulic/Mechanical/CALIPER, Disc Brake - Installation .
  6. Install the wheel and tire assembly. Refer to Tires and Wheels - Standard Procedure .
  7. Remove the support and lower the vehicle.