LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2010 >> Liberty Renegade, Part Time >> Repair and Diagnosis >> Suspension >> Wheel Alignment >> Front Suspension >> Front >> ARM, Upper Control >> Installation >> Right Side
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Right Side

  1. Install the upper control arm to the vehicle.
  2. Install the upper control arm front flag bolt. With full vehicle weight  , tighten the nut to 122 N.m (90 ft.lbs.).
  3. Install the upper control arm rear flag bolt. With full vehicle weight  , tighten the nut to 122 N.m (90 ft.lbs.).
  4. Install the air box.
  5. Install the upper ball joint nut. Tighten the nut to 41 N.m (30 ft.lbs.) plus an additional 90° turn.
  6. Install the right side tire and wheel assembly. Refer to Tires and Wheels/Wheels - Standard Procedure .
  7. Remove the supports and lower the vehicle.
  8. Set the toe. See Front Suspension/Wheel Alignment - Standard Procedure .