LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2012 >> Grand Cherokee 2WD V8-5.7L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Variable Valve Timing Solenoid >> Service and Repair >> Oil Intake Control Valve - Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Oil Intake Control Valve - Installation





INSTALLATION






NOTE: Ensure that the O-ring is fully seated into the cylinder block.

1. Position the oil control valve (3) into the cylinder block.
2. Securely tighten the oil control valve retaining bolt (2).
3. Connect the oil control valve electrical connector (1).
4. Install the intake manifold Intake Manifold - Installation.