October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Solenoid, Variable Valve Timing: Installation
Courtesy of CHRYSLER GROUP, LLC
|
- Install a NEW
gasket (1).
Courtesy of CHRYSLER GROUP, LLC
|
- Install the Variable Valve Timing (VVT) solenoid (1) and tighten the bolts (2) to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
Courtesy of CHRYSLER GROUP, LLC
|
- If removed, install the right isolator to engine mount bracket bolt (2) and tighten to the proper torque specification. Refer to TORQUE SPECIFICATIONS .
Courtesy of CHRYSLER GROUP, LLC
|
- Connect the VVT solenoid wire harness connector (1).
- Install the clean air hose and air cleaner body cover. Refer to INSTALLATION
.
- Install the top engine cover. Refer to COVER, ENGINE, INSTALLATION
.
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector to the negative battery cable.