LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2020 >> Grand Cherokee Altitude, AWD >> Repair and Diagnosis >> Accessories & Equipment >> Drivers Assistance Systems - ADAS >> Electronic Control Modules (Service Information) >> Module, Keyless Ignition Node (Kin) >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Module, Keyless Ignition Node (Kin): Installation

GC0175250Courtesy of CHRYSLER GROUP, LLC
  1. Install the fasteners (1) securing the KIN module to the bezel.
    GC0175213Courtesy of CHRYSLER GROUP, LLC
  2. Connect the Keyless Ignition Node (KIN) module wiring harness connector (1).
    GC0175275Courtesy of CHRYSLER GROUP, LLC
  3. Install the bezel onto the instrument panel and install the fasteners (1) securing the bezel.
    GC0173545Courtesy of CHRYSLER GROUP, LLC
  4. Install the steering column gap hider and engage the retainers.
  5. Install the instrument panel center bezel. Refer to BEZEL, INSTRUMENT PANEL, CENTER, INSTALLATION .
  6. If the KIN was replaced, perform the (Radio Frequency (RF Hub) Module Verification Test. Refer to STANDARD PROCEDURE .