LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2012 >> Optima L4-2.4L >> Repair and Diagnosis >> Power and Ground Distribution >> Relay Box >> Testing and Inspection >> The Other Fuses And Relays Component
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

The Other Fuses And Relays Component





Inspection

Power Relay Test (Type B)
Check for continuity between the terminals.
A : Two turn unlock relay
1. There should be continuity between the No.30 and No.87 terminals when power and ground are connected to the No.85 and No.86 terminals.
2. There should be continuity between the No.30 and No.87 terminals when power is disconnected.