Control Valve Assembly: Installation
Installation is in the reverse order of removal (See REMOVAL ).
AFTER INSTALLATION, FILL AHC PUMP MOTOR RESERVOIR WITH SUSPENSION FLUID AHC,BLEED AHC SYSTEM (See ACTIVE HEIGHT CONTROL SYSTEM ) AND CHECK FOR LEAKS (See ON-VEHICLE INSPECTION )