Floor Shift Assembly: Installation
- INSTALL FLOOR SHIFT ASSEMBLY
- Install the floor shift assembly with the 4 bolts.
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Connect the connector to the floor shift assembly.
- Install the floor shift assembly with the 4 bolts.
- INSTALL FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
- Install the floor shift gear shifting rod sub-assembly with the nut.
Torque: 13 N*m (130 kgf*cm, 9 ft.*lbf)
- Install the floor shift gear shifting rod sub-assembly with the nut.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- ADJUST SHIFT LEVER POSITION (See ADJUSTMENT )
- INSPECT SHIFT LEVER POSITION (See ON-VEHICLE INSPECTION )
- INSTALL FRONT FLOOR HEAT INSULATOR NO.1 (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
(See INSTALLATION )
- INSTALL NO.2 CONSOLE BOX DUCT (See INSTALLATION )
- INSTALL CONSOLE BOX (See INSTALLATION )
- INSTALL CONSOLE BOX REGISTER ASSEMBLY (See INSTALLATION )
- REMOVE CONSOLE BOX PLATE (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH (See INSTALLATION )
- INSTALL INSTRUMENT PANEL FINISH PANEL END RH (See INSTALLATION )
- INSTALL CONSOLE UPPER PANEL ASSEMBLY (See INSTALLATION )
- INSTALL FRONT CONSOLE UPPER PANEL GARNISH (See INSTALLATION )
- PERFORM INITIALIZATION
(See INITIALIZATION )