Front Active Stabilizer Control Ecu: Installation
- INSTALL FRONT ACTIVE STABILIZER CONTROL ECU
- Connect the ECU connector.
HINT:
Connect the connector before installing the ECU.
- Install the ECU with the bolt and 2 nuts.
Torque: 7 N*m (71 kgf*cm, 62 in.*lbf) for nut
9 N*m (92 kgf*cm, 7 in.*lbf) for bolt
- Using the procedures below, connect the ECU connectors.
- Connect the ECU connector.
- Rotate the lever in the direction of the arrow until a "click" sound is heard.
- Lock the lever's lock.
- Install the 2 ground wires to the ECU with the 2 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Connect the wire harness clamp to the bracket.
- Connect the ECU connector.
- INSTALL NO. 2 COOL AIR INTAKE DUCT
- Install the intake duct with the 2 bolts.
- INSTALL FRONT FENDER LINER RH
- INSTALL FRONT FENDER WHEEL OPENING MOULDING RH
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION (2006/02-2006/07)
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION (2006/02-2006/07)
).