Charging Systems: Charging: Generator: Installation
- INSTALL GENERATOR ASSEMBLY
- Install the generator with the bolt and 2 nuts.
Torque: Bolt
39 N*m (400 kgf*cm, 29 ft.*lbf)
Nut (M10)
39 N*m (400 kgf*cm, 29 ft.*lbf)
Nut (M8)
16 N*m (158 kgf*cm, 11 ft.*lbf)
- Connect the generator connector.
- Connect the generator wire with the nut and rubber cap.
Torque: 9.8 N*m (100 kgf*cm, 86 in.*lbf)
- Install the generator wire clamp to the cord clip on the generator.
- Install the generator with the bolt and 2 nuts.
- INSTALL VANE PUMP ASSEMBLY
- Install the vane pump assembly with the nut and 2 bolts.
Torque: Nut
43 N*m (438 kgf*cm, 32 ft.*lbf)
Bolt
43 N*m (438 kgf*cm, 32 ft.*lbf)
- Connect the vacuum hose.
- Install the vane pump assembly with the nut and 2 bolts.
- INSTALL FAN WITH FLUID COUPLING
- Put the fan with fluid coupling and fan shroud into the engine room at the same time.
- Install the fan shroud with 3 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the fan with fluid coupling with 4 nuts.
Torque: 29 N*m (296 kgf*cm, 21 ft.*lbf)
- INSTALL FAN AND GENERATOR V BELT (See REMOVAL )
- INSTALL RADIATOR UPPER SUPPORT SEAL
- CONNECT BATTERY NEGATIVE TERMINAL